project 3

here we go…


precedent studies:

parametrically controlled cable overhead installation

trajectory: resin as structural element, added reinforcement with other non-structural elements.

final composite as a structural system of non-structure

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s